CSCEC completes raft slab pouring for UAE's Safa Two project

Pubtime:04.12.2024
【Font size:BigMidSmallPrint

Recently, CSCEC successfully concluded the raft slab pouring for the Safa Two project in the United Arab Emirates. The operation required approximately 14,000 tons of steel reinforcement and over 25,000 cubic meters of concrete.

IMG_4024.JPG

The Safa Two project, commissioned by UAE luxury real estate developer DAMAC Properties, is a landmark project in Dubai's Business Bay district. Standing at 336.75 meters tall, the building features a distinctive jewelry-inspired design, combining architectural innovation with complex structural engineering. Upon completion, Safa Two will become a premier addition to Dubai's skyline.

IMG_4025.PNG


Site Map  |  Legal Statement  |  FAQ  |  Contact Us

©2017-2020 CSCEC ICP 05049820 CSCEC . LTD ICP 08010180